Chapter 2, Installation – Allied Telesis AT-8088/xx (MT and SC) User Manual
Page 46
Advertising

46
Chapter 2
Installation
This chapter contains the installation procedures for the switch. The
chapter contains the following sections:
Selecting a Site for the Switch
Installing the Switch in a Rack
Installing an Optional GBIC Module
Installing an Optional Expansion or Stacking Module
Installing an Optional AT-RPS3004 Redundant Power Supply
Cabling and Powering ON the Switch
Advertising