Inal installation – Swiftech H20 120 R2 User Manual
Page 9

8. Final
installation
Once your system has been tested for leaks, it is now time to proceed with the final installation. Assuming that you followed our
, re-install the motherboard inside of the chassis, being careful to keep the water-blocks out of the way (some wire-ties or rubber
bands strategically placed are a good help). Then perform the final water-block installation using thermal grease, in accordance with your
specific water-block model installation guide (see appendix).
Figure 6
Figure 6 above illustrates an installation using the MCRES-525 reservoir, MCP650 pump, MCW6000-A water-block, MCW20 chipset cooler,
MCW50 VGA cooler, and MCR120 radiator mounted externally with the MCB-120 “Radbox”
Rouchon Industries, Inc., dbA Swiftech™ – 1703 E. 28
th
St, signal Hill, CA 90755, USA – T (562) 595-8009 – F (562) 595-8769 – All content
Copyright Swiftech 2004 – Last edited 9-27-04 – Subject to revision without notice
- 9 of 40 -