American Power Conversion 10-30 KVA User Manual
Page 45
Advertising

Electrical Installation – Connection of APC Humidity Sensor
990-1598B
Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual
39
Guide the cable up alongside the side panel and insert the Humidity Sensor plug into the socket
marked “Probe”.
Fasten the cable to the side panel with enclosed cable ties.
Remount the cable-inlet plate.
Place the Humidity Sensor where applicable.
Advertising
This manual is related to the following products: