American Dryer Corp. ML-75HS User Manual

Page 28

Advertising
background image

24

The only electrical input connections to the dryer are the 3-phase (3Ø) power leads (L1,L2,L3 and

sometimes neutral) and ground. Single-phase (1Ø) power for the control circuit is done internally to

the dryer. No single-phase (1Ø) input connection is required on a three phase (3Ø) dryer.

For gas and steam dryers manufactured for operation at three phase (3Ø), the electrical connections

are made at the power distribution block located in the service box at the rear, upper left corner of the

dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the

service box contactor, the service box cover must be removed.

Advertising