Panasonic 36PET1U6 User Manual

Page 20

Advertising
background image

20

(d) Installing the ceiling panel

Attach the ceiling panel to the air-intake plenum.

Drawing the panel downwards sets the panel in position

temporarily with the panel catch (at 2 locations).

Remove the socket cover of the air-intake plenum and pass

the 8P sockets through it.

(Fix the panel lead wire to air-intake plenum side clamper.)

Connect the 3P socket (white) and 2P socket (green) to the

other side of the 3P socket (white) and 2P socket (green)

respectively.

Reattach the socket cover.

Fig. 3-18

Duct connection box

Duct connection flange

Panel catch

(M4xL1/2”, 4pcs.)

Installation screws

Ceiling panel

Please fix the socket cover located on the switch box

after closing the lid for the switch box.

CAUTION

Take adequate precautions

when installing onto the

ceiling.

The air-intake plenum is

especially prone to rupture

if struck on it's side.

Panasonic_PAC-i_IndoorUnit_US-le20 20

Panasonic_PAC-i_IndoorUnit_US-le20 20

2011/11/02 15:17:17

2011/11/02 15:17:17

Advertising
This manual is related to the following products: