Т³ 12, Installation (in existing construction ), Product service – Panasonic FV-10VSL2 User Manual

Page 12

Advertising
background image

1. Installation in existing construction.
Installing the fan body in an existing building requires an accessible area (attic or crawl space) above
the planning installation location or existing ducting and wiring.

(3) Install fan body.

(2) Inspect duct work and wiring before proceeding with installation.

(3) Plan suitable location for fan body. (next to ceiling joist)

(4) Before installation, provide inspection and maintenance access at a location that will not interfere
with installation work shown in installation

(5) First, remove ceiling section according to Fig.6 of page 7.

(6) Install fan body.

(1) Inspect duct work and wiring before proceeding with installation.

(2) Remove ceiling section according to Fig.6 of page 7.

2. Installation from accessible area above fan location.

CAUTION:

Check area above planning installation location to be sure that:
1. Duct work can be done and that area is sufficient for proper ventilation.
2. Wiring can be run to planning location.
3. No wiring or other obstructions shall interfere with installation.

INSTALLATION (IN EXISTING CONSTRUCTION )

(1) To install the fan body, follow the procedures described in lnstallation . Take the following
precautions before installation.

PRODUCT SERVICE

Warning Concerning Removal of Covers.
The unit should be serviced by qualified technicians only.
Your product is designed and manufactured to ensure a minimum of maintenance.
Should your unit require service or parts, call Panasonic Call Center at 1-866-292-7292 (USA)
or 1-800-669-5165 (Canada).

T0212-0 08VSLA220

Panasonic Corporation of North America

One Panasonic Way, Secaucus, New Jersey 07094
www.panasonic.com

Panasonic Canada lnc.

5770 Ambler Drive, Mississauga, Ontario L4W 2T3
www.panasonic.ca

Printed in China

Panasonic corporation 2012

Advertising