INSTALLATION LOCATION

• We recommend that this air conditioner be installed properly by qualified installation

technicians in accordance with the Installation Instructions provided with the unit.

• Before installation, check that the voltage of the electric supply in your home or office is the

same as the voltage shown on the nameplate.

ELECTRICAL REQUIREMENTS

1. All wiring must conform to the local electrical codes. Consult your dealer or a qualified

electrician for details.

2. Each unit must be properly grounded with a ground (or earth) wire or through the supply

wiring.

3. Wiring must be done by a qualified electrician.

Do not install this air conditioner where there are fumes or flammable gases, or in an
extremely humid space such as a greenhouse.

Do not install the air conditioner where excessively high heat-generating objects
are placed.

Avoid:

To protect the air conditioner from heavy corrosion, avoid installing the outdoor unit where
salty sea water can splash directly onto it or in sulphurous air near a spa.

To warm up the system, the power mains must be turned on
at least five (5) hours before operation. Leave the power
mains ON unless you will not be using this appliance for an
extended period.

Disconnect the mains plug from the supply socket and main circuit breaker when not in use for
an extended period of time. When turning off some of the outdoor or indoor units, the entire
system becomes inoperative.

Power mains

ON

NOTE