Preparing the rack for server installation – Acer Altos MU.R230E.001 User Manual

Page 137

Advertising
background image

127

Preparing the rack for server installation

1

Install eight distands into the vertical rails of the system rack.

2

Adjust the front bracket to the preferred length.

(1) Turn the captive thumbscrews counterclockwise to loosen

them.

(2) Slide the front bracket to the preferred length.

(3) Secure the front bracket in its preferred position by turning

the captive thumbscrews clockwise.

Do the same thing to the other front bracket.

Advertising
This manual is related to the following products: