Power up display sequence, E.gnd, Power down by disconnecting power source from spa – Balboa Water Group EL/VS 120V-240V User Manual

Page 39: Power up by connecting power source to spa, Wait until “ ” is displayed on your panel, Power down again, Power up again, Switchbank a tst rst, Ba lbo a, J43 j6

Advertising
background image

39

VS-GS Persistent Memory with VL Panels

Any time you change a DIP Switch, other than A1, you must reset Persistent
Memory for your new DIP Switch Settings changes to take effect. If you do
not reset Persistent Memory, your system may function improperly.

To reset Persistent Memory:
s

Power down by disconnecting power source from spa.

s

Put a jumper across J43, covering both pins. (See illustration below)

s

Power up by connecting power source to spa.

s

Wait until “

” is displayed on your panel.

s

Power down again.

s

Remove jumper from J43 (May also move to cover 1 pin only)

s

Power up again.

About Persistent Memory and Time of Day Retention:

This system uses memory that doesn’t require a battery to store a variety of
settings. What we refer to as Persistent Memory stores the filter settings,
the set temperature, and the heat mode.

Persistent Memory is not used for Time of Day. Only models with a
Serial Deluxe panel installed (VS5xxDZ and GS5xxDZ) can display the
time. However, during power loss to the spa, the system will lose the
correct time, and reset to 12:00 PM when power is restored.

Power Up Display Sequence

Upon power up, you should see the following on the display:

s

Three numbers in a row, which are the SSID (the System Software

ID). The third display of these numbers is the Software Version,
which should match the version of your system. For example, if these
three numbers are

, that is a VS511SZ at version 38.

s

Displayed next is: “

” (indicating the system is configured for

a heater between 3 and 6 kW) or “ ” (indicating the system is
configured for a heater effectively* between 1 and 3 kW).

” should appear for all VS models running at 240VAC.

“ ” should appear for all VS models running at 120VAC, as well
as all GS models. (*A heater which is rated at 4 kW at 240VAC will
function as a 1 kW heater at 120VAC.)

s

” will appear to signal the start of Priming Mode.

At this point, the power up sequence is complete. Refer to the Reference
Card for the VS or GS System model of your spa for information about how
the spa operates from this point on, including how to adjust the Time of
Day if using a Serial Deluxe style panel.

G

C

G

C

G

C

G

C

C

G

T1

SWITCHBANK A

BALBOA INSTRUMENTS, INC.

VS500Z

P/N 22972 REV D

MADE IN U.S.A

COPYRIGHT 2005

S1

J6

J7

J8

J44

J60

J22

U4

FUSE .3A 250V

FUSE 20A 250V

FU

SE 3A 250V

E.GND

F4

K6

K1

K8

K9

K5

J23

J46J46

F1

J29

J47

J50

F7

J17

/26

J20

J1A

J10

J13

J2A

EXT.TT

RLY

LL

TST

AUX. F

SEN. A SEN. B

VAC

VV

W1

W7

J1

J2

W2

W3

G

C

W

4

K2

K3

F2

J12

1

2 3

J43

2-SPD

EXT RLY

J1

8

SWITCHBANK A

S1

J6

E.GND

TST

J43

J43 on VS5xxZ and VS300 Series Main Board Shown.
J43 on GS5xxZ Series is located in approximately the same position.

G

C

SWITCHBANK A

P/

N 22964

_B

MA

DE

IN

U.

S.

A.

VS100

©

200

6

S1

K3

K5

K4

K1

PUMP

K2

J7

J8

U4

T0.25A 250V

F2

J23

G

C

OZONE

J29

HEATER

AA

J9

J20

TST

RST

SEN. A

SEN. B

J1

Ba

lbo

a

F4

J43

J6

G

C

F5, F3A 250V

J26

J58

J57

J50J50

J13J13

J12J12

J90J90

LINE

NEUTRAL

NEUTRAL

WHT AC

BLK AC

W1

J18

SWITCHBANK A

TST

RST

J43

J6

J43 on VS100/GS100 Series Main Board Shown.

Advertising