2 installation, 1 space requirements, 2 installation process – Beijer Electronics iX Panel K70 EN User Manual
Page 6: 2installation
Advertising

Installation
2
Installation
2.1 Space Requirements
•
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
•
Space requirements when installing the operator panel:
50 mm
50 mm
100 mm
285 mm
177 mm
56 mm
100 mm
100 mm
(6.97 inch)
(2.0 inch)
(4.0 inch)
(4.0 inch)
(2.0 inch)
(4.0 inch)
(2.20 inch)
(11.22 inch)
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier.
x 6
Panel cut out 245.5 x 138.5 mm
(9.67 x 5.45 inch)
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
Beijer Electronics, MAEN996
6