Brockston bath vanity, Installing quartz countertop and lavatory, Setting up your new vanity – Decolav 1790 User Manual

Page 2: Assembly instructions

Advertising
background image

Please contact 1-866-332-6528 for further assistance

DecolaV.com

© Deco laV, inc. 2014

2

assemBly instructions

• Place the quartz countertop and lavatory on top of the vanity cabinet.

adjustments may be necessary to align correctly. see figure 1

installing quartz countertoP and
lavatory

2

• carefully remove your new vanity from carton and place safely aside
• turn off water supply to faucet
• remove existing vanity
• Determine the location in the bathroom the vanity will be installed
• measure the vanity width and height and mark outline on wall
• move the vanity into place and level with the adjustable glides on bottom

of vanity

• locate and mark wall studs

setting uP your new vanity

1

Brockston Bath vanity

item #1790-roK

figure 1

figure 2

Apply Silicone Here

Apply Silicone Here

Vanity

Quartz

Countertop

Lavatory

36.1

916

8.5

216

15.7

400

3

76

6

152

0.5

12

28.7

729

FRONT VIEW

30"

762

23.8

605

16

406

3.7

93

1.7

42

1.8

45

22

560

TOP VIEW

33.7

856

2.4

60

23.1

586

SIDE VIEW

Finished Wall

Finished Floor

Finished Wall

note: use Decolav drain item #9290-cP/sn/Pn/DB,
9296-cP/sn/Pn/DB or #9298-cP/sn/Pn/DB.
Decolav cannot guarntee leakage wih other manufacturer drains.

note: use Decolav decorative bottle trap item #9102-cP/sn/
Pn/DB to complete the look.

Advertising