Finishing the installation – Minka Group F518-ORB User Manual
Page 13
Advertising

5
FINISHING THE INSTALLATION
Step 1. Loosen two of the four screws from the mounting
bracket and remove the other two.
Step 2. Remove the motor assembly from the mounting
bracket hook and engage the key holes to the two screws
previously loosened.
Step 3. Install the two screws previously removed and
tighten all four screws.
Fig. 5
Advertising
This manual is related to the following products: