5. Mount the cartridge mechanical seal (250) on the shaft. Do not tighten the gland nuts at this

time.

Figure 18: Mount the cartridge mechanical seal on the radial end

Figure 19: Mount the cartridge mechanical seal on the thrust end

Confirm the seal chamber runout

The bearing housings are doweled to the casing (100) during the original build. However, in
order to assure the correct running position of the shaft, use this procedure in order to confirm
the seal chamber runout before you install the cartridge mechanical seals:
1. Install the old bearings on the shaft and bolt the bearing housings to the casing and head.
2. Mount the dial indicator on the shaft (122). Rotate the shaft (122) so that the indicator rides

along the seal chamber bore for 360°.

3. If the total indicator reading exceeds 0.005 in. (0.127 mm), determine the cause and make

corrections.
It may be necessary to readjust the housing.
a) Remove the dowel pins and use the adjusting screws to bring the runout to within 0.002

in. (0.0508 mm).

b) Redowel the housings in a different location.

4. Check the seal-chamber face runout.

a) With a dial indicator mounted on the shaft, rotate the shaft so that the indicator rides

along the seal-chamber face for 360°.

b) If the total indicator reading exceeds the allowable runout as this table shows,

determine the cause and make corrections.

Frame group

Nameplate radial

Maximum allowable total indicator reading in inches

bearing

(millimeters)

S

6309

0.0020 (0.0508)

M / MX

6312

0.0025 (0.0635)

L / LX

6313

0.0030 (0.0762)

XL

6318

0.0035 (0.0889)

Installation, Operation, and Maintenance Manual