10x10x28 SRL-XT

DISMANTLING PROCEDURE

1.

Remove section of suction pipe adjacent to suction casing (2-001-5). Casing

is provided with removable cover (2-091-0) with suction sideplate (2-046-5)
attached. Cover is held to casing by (12) studs and retaining nuts of which (4) hold
suction side liner (2-174-5) in place. Remove cover and attached suction sideplate
by means of jackscrews provided. If necessary, remove suction sideplate from
cover attached by (4) retaining studs and nuts.

Break discharge connection, support discharge pipe, loosen and remove bolts
holding casing halves. Make sure suction casing is supported from dropping.
After suction casing is removed, suction side liner (2-174-5) can be removed with
jackscrews provided.

2.

Impeller (4-002-0) is mounted with a right hand thread. Rotation is clockwise

viewed from the pump drive end. To remove the impeller, first remove the shaft
sleeve nut (5- 020-3). This is done by removing the two (2) Socket Head . Then
using one as jackscrew in tapped hole at crown of nut, force joints apart
sufficiently to lever one nut half clear from shaft shoulder. Other half may then be
removed by hitting nut with wooden mallet or of similar soft material to prevent
damage to nut half. With nut off, impeller can be easily removed from shaft by the
application of shock load counterclockwise (viewed from impeller end) while
holding shaft from rotating.

3.

Remove gland (6-014-0). Remove shaft sleeve (1-009-0) by sliding if off the

shaft.

4.

Remove gland side liner (2-174-0) by means of jackscrews provided.

5.

Remove both bearing cylinder straps (5-127-0).

6.

Drain oil from bearing cylinder (5-084-0) by removing side pipe plug.

7.

Loosen adjusting screws. Then rotate bearing cylinder assembly so that the

cylinder lugs do not foul pedestal (5-083-0) when removing the bearing cylinder
assembly.

8.

Place the bearing cylinder assembly on work bench and, if possible, hold it in

a fixed position.

9.

Remove packing (6-924-0) and water seal bushing (6-008-0) from the

stuffing box. Note the order in which parts are removed in this arrangement. See
page 2 for stuffing box arrangement A or B.

10. Stuffing box (6-073-0) normally would not be removed unless bushing
(6-008-0) needs replacement. If required, unscrew (4) retaining socket capscrews.
Then using two (2) jackscrews in tapped holes remove stuffing box from casing.

11. Remove deflector (5-040-3). Remove inboard bearing cover (5-018-3) and
accompanying O-ring (5-914-3). Remove cover carefully so as not to damage
bearing seal. Now bearing seal (5-177-3) may be inspected and removed, if
necessary.

12. With key removed from shaft, the outboard bearing cover (5-018-4) will
slide off the shaft after removal of bolts. Clean shaft before removing bearing
cover. Remove accompanying O-ring (5-194-4). Now bearing cover seal
(5-177-4) may be inspected and removed, if necessary.

13. Remove shaft (5-007-0) and bearing assemblies from the bearing cylinder by
supporting shaft and pushing or pulling it out from the cylinder. Take care not to
damage shaft surfaces.

14. Remove inboard roller bearing (5-038-3) by using a suitable bearing puller.
Remove locknut (5-516-4) and lockwasher (5-517-4). Remove outboard roller
bearing (5-038-4) by using a suitable bearing puller. Remove bearing spacer
(5-078-4). Remove thrust bearing (5-038-0) by using a suitable bearing puller.
Now remove spring retainer (5- 147-4) and accompanying springs.

ASSEMBLY PROCEDURE

IMPORTANT - It is essential that all parts be thoroughly cleaned before
reassembly. When handling rotating elements and bearings, maintain a clean and
dust-free environment. Do not unwrap new bearings prior to their installation.
New bearings are coated with a rust preventative having good lubricating
qualities. This coating should not be removed unless the bearings have become
dirty while in storage.

1.

Mount inboard roller bearing (5-038-3) on shaft (shrink fit) by first heating it

in hot oil at approximately 150° F (66° C) for sufficient expansion. In mounting,
inner race of bearing must contact shaft shoulder. Dry cool bearing to room
temperature.

2.

Place spring retainer (5-147-4) on shaft and also outer race of thrust bearing.

Mount thrust bearing spacer ring on shaft (5-007-0) to contact shoulder. Mount
thrust bearing (5-038-0) on shaft (shrink fit) by first heating it in hot oil at
approximately 150° F (66° C) for sufficient expansion. In mounting, inner race of
bearing must contact spacer ring. Dry cool bearing to room temperature.

3.

Mount bearing spacer (5-078-4) with largest diameter adjacent to thrust

bearing (5-038-0). Mount outboard roller bearing (5-038-4) on shaft using the
same method as thrust bearing (5-038-0). Inner race of bearing must contact
spacer.

4.

Mount (5-517-4) and locknut (5-516-4). During assembly of shaft and

bearings into cylinder (5-084-0) place springs into spring retainer (5-147-4) and
align retainer with outer race of thrust bearing (5-038-0) so that both will enter
bearing cylinder bore during assembly sequence. Also ensure that inboard
bearing (5-038-3) outer race is parallel and square to shaft at assembly. Put shaft
and bearings into cylinder..

5.

Assemble bearing seal (5-177-4) and O-ring (5-914-4) in cover (5-018-4)

and mount to bearing cylinder (5-084-0). After tightening screws, an axial
clearance of .004" - .015" between outer race of thrust bearing (5-038-0) and
spring retainer (5-147-4) should exist. Check this clearance by using hole on top
of bearing cylinder.

6.

Mount bearing seal (5-177-3) and O-ring (5-914-3) in cover (5-018-3) and

bolt to bearing cylinder. Mount deflector (5-040-3).

7.

If removed from casing, re-install stuffing box (6-073-0) at this time. Install

water seal bushing (6-008-0) and mount stuffing box in gland half casing
(2-001-0), using two straight dowels to locate the stuffing box.

8.

Place bearing cylinder (5-084-0) on pedestal (5-083-0) and bolt straps

(5-127-0) into place. Leave bolts slightly loose for later adjustment, step 12.

9.

Install gland side liner (2-174-0). Re-assemble sleeve nut (5-020-3) and

mount against shaft shoulder. Mount sleeve (1-009-0). Replace packing
(6-924-0) and gland (6-014-0).

10. Screw on impeller (4-002-0).

11. Replace suction side liner (2-714-5) and replace retaining studs finger tight.
Replace suction cover (2-091-0) complete with suction sideplate (2-046-5).
Secure cover to casing and tighten side liner and sideplate retaining stud nuts.
Bolt casing halves together and then recheck above-mentioned nuts for tightness.

12. See impeller clearance adjustment. After clearance is established secure all
bolts on bearing cylinder straps. Secure adjusting screws.

13. Reconnect suction and discharge piping.

14. Fill bearing cylinder with oil using oil cap (5-530-0) to proper level (see sight
glass). Cylinder must be horizontal and level so that both sight glass oil readings
are identical. Pack both bearing cover seals with high temperature grease through
grease fittings on covers. See LUBRICATION page 2.

IMPELLER CLEARANCE ADJUSTMENT

1.

Loosen the bolts clamping down the bearing cylinder or frame liner straps.

2.

By means of the adjusting screw, move the bearing cylinder forward until the

impeller touches the suction sideplate. This is tested by rotating the shaft by hand.

3.

The bearing cylinder or frame liner should then be brought back 1/16" so that

the impeller will not rub on suction sideplate.

4.

Check the rotating element by hand for freedom of rotation.

5.

Retighten bearing cylinder straps. By making this adjustment periodically

(depending on the rate of wear) original pump efficiency can be maintained.