Unpacking – Australian Monitor EQ302 User Manual

Page 5

Advertising
background image

Before using the product, please read this manual carefully and operate only in the manner described. If you have any
questions, please ask your local dealer or visit the Australian Monitor website www.australianmonitor.com for assistance.

Whilst unpacking the equaliser from its cardboard container, please check and ensure that no damage has occurred in
transit. Any damage to the goods must be immediately notified to the supplier. Retain any packaging until such time that you
are happy to take ownership of the goods. Please consider disposing of packaging in a suitably environmentally
friendly manner.

Contents

1 x EQ302, Dual 30 Band Graphic Equaliser

1 x User Manual

1 x IEC Mains Power Cable

4 x 3 way Phoenix connectors

Power Requirements

Before powering the equaliser, ensure that your mains power voltage is the same as the back panel voltage selections
switch indicates before connecting to the mains power outlet.

The switch allows you to select either 230 or 115 VAC mains supply at either 50 or 60 Hz.

This unit must always be connected to a suitable mains earthed outlet. It is recommended that any rack framework

used to mount the equaliser be also earthed to the same grounding circuit.

Always ensure that the equaliser’s power switch is off and that the power lead is disconnected from the mains power

supply prior to altering the voltage selection switch.

Before using the equaliser, please confirm the socket and the power cable are in good condition before connecting.

Always ensure that an appropriate fuse is used. The EQ302 is supplied with a T500mA M205 fuse which is suitable

for both mains voltages.

PAGE 5

EQ302 INSTALLATION AND OPERATION MANUAL

UNPACKING

Advertising