Т³гж 11, Installation instructions, Fig.a – Comfort-Aire RAD-123G User Manual

Page 11

Advertising
background image

Air Directional Louvers

The louvers will allow you to direct the air flow Up
or Down(on some models) and Left or Right
throughout the room as needed. Pivot horizontal
louvers until the desired Up/Down direction is
obtained.

Move the Center Handles from side to side until the
desired Left/Right direction is obtained.

Center Handles

Air Direction

INSTALLATION INSTRUCTIONS

3 4 Screws
(7)

Lock Frame
(2)

Sash Lock
(1)

Mounting Hardware

Top Rail Hardware

3 8 Screws
(4)

Top Rail
(1)

Before installing unit, the top rail must be assembled
on the unit (For <10000Btu/h models only).

Tool Needed: Phillips Screwdriver

A: Remove the air conditioner from the carton and place
on a flat surface.

B:

Remove top rail from the rear of the packaging material

as shown in Fig. A.

10

NOTE: The top rail hardware and the following Fig.A,
Fig.B and Fig.C are not applicable to the units more
than 10000Btu/h.

Fig. 1

INTERIOR
WALL

Wooden Windows

WINDOW SILL

Your air conditioner is designed to install in standard double hung windows with opening widths of
23 to 36 inches(584mm to 914mm) (See Fig.1).

Packaging

Fig.A

Top Rail

Lower sash must open sufficiently to allow a clear vertical
opening of following size (see Table 1).Side louvers and the
rear of the AC must have clear air space to allow enough
airflow through the condenser,for heat removal. The rear of
the unit must be outdoors, not inside a building or garage.

NOTE: Save Carton and these Installation Instructions
for future reference. The carton is the best way to store unit
during winter, or when not in use.

TOOLS NEEDED:
Phillips Screw Driver
Drill(If pilot holes are needed)

CAUTION: When handling unit, be careful to avoid cuts from
sharp metal edges and aluminum fins on front and rear coils.

Model

Size

5000~8000Btu/h

10000~12000Btu/h

14 (356mm)

15-1/2 (394mm)

Table 1

Advertising