AMD OPTERON 30925 User Manual

Page 49

Advertising
background image

30925 Rev.

3.04 February

2004

Builder’s Guide for AMD Opteron™ Processor-

Based Servers and Workstations

Appendix A

AMD Opteron™

Processor-Based System Build Procedure

49

a. Turn off the system and unplug it before installing each card.

b. Install additional cards one at a time.

c. Restart the system after every card installation.

Note: If you have difficulties with the installation of any of the cards or drivers, refer to

Complex

Configurations and IRQ Info, available on the AMD website.

23. As you install each card, verify the card is properly seated (connector fully inserted into the

slot, front and back) and that the retention screws are in place.

24. Test the complete system for proper operation. If system functions properly, load any other

software.

Advertising