Installation procedure, Parts list, Product overview – Muxlab LongReach 16 Active CCTV Hub User Manual
Page 6: Parts, List, Product, Overview
Advertising

© MuxLab Inc.
LongReach 16 Active CCTV Receiver Hub Installation Guide
Page 6
3.
Installation Procedure
3.1.
Parts List
The LongReach 16 comes with the following parts. Please verify that all
pieces are present before proceeding.
• Base Unit (Factory configuration: rack mount)
• External Power Supply 24VAC, 60VA (Europe: 70VA)
• Rubber stand-offs
• Installation Guide
3.2.
Product Overview
The external connections and diagnostics of LongReach 16 are detailed in the
following diagrams. Please familiarize yourself with them before installing the
unit.
Figure 1: Front panel, all models
Figure 2: Rear panel, UTP/UTP version
Figure 3: Rear panel: UTP/Coax version
Active CCTV Receiver Hub
LongReach 16
Video
Input
Video
Input
Advertising