Installation & power-up procedure – Muxlab 6G-SDI Extender Over UTP User Manual

Page 13

Advertising
background image

© MuxLab Inc.

6G-SDI Extender Over UTP

Page 13

3.4.

Installation & Power-up Procedure

In order to install the product, please follow the steps
below:

1. First, install the Transmitter unit by attaching it by

its mounting holes or by other means close to the
SDI generating source.

2. Then, connect the necessary number of SDI

Compatible 75Ω Coax cable in order to carry the
video/audio signal. Always start by connecting the
first cable to the BNC A, then B and so on.

3. When the Transmitter is installed and connected

with the SDI coax cables then connect and run the
UTP Cat5E or Cat6 to the receiver unit. (100m max
for 6G/3G Signal and 150m max for HD Signal).

4. After hooking up the UTP cable to the RJ-45 port on

the receiver unit. Connect the SDI coax cables from
the unit to the destination device (e.g.: Recorder,
Monitor, Capture card, Etc…)

5. Now that all the cabling is installed, the only thing

left to do is to plug the 48VDC wall-mount power
supply.

6. Each unit will power up then initialize itself. The

receiver unit is supplying the transmitter through the
UTP cable.

7. The next step is for the UTP link to connect, the link

indicator on each unit will blink when the
negotiation process will be over.

8. If the source is generating a video signal at the

transmitter unit, then the receiver will output the
same signal.

Advertising