6. Commissioning, operation

Commissioning

During the commissioning process pressure surges must be avoided

at all costs

Install the pressure connection according to the symbols

⊕ high pressure ⊖ low pressure

Use the pressure gauge only if the diaphragm is undamaged and if it

is in perfect condition with regard to safety.

Option screw built-in variant

After fitting the measuring element into the case

it can be moved in a clockwise and counter-

clockwise direction respectively for 15 angular

degrees in order to ensure precise horizontal

positioning of the instrument.