Cub Cadet 759-3971 User Manual

Page 7

Advertising
background image

7

FIGURE 6

H)

Install the valve assembly into the frame and loosely fasten with the previous removed
hardware. Follow the installation instructions in the Owner’s Manual that came with the
Front Hitch System Attachment and Hydraulic Angling Attachment for installing the
hydraulic lines/tubes and securing the valve assembly to the frame. See Figure 7 and 8.

I)

If not already installed, install previously removed O-Rings on the ends of the new hydraulic
tube (F) (Aux. from Steering). Reassemble in reverse order using instructions in steps B and
A. NOTE: When installing the steering pump port plate, place a small amount of grease on
the O-Rings and cover the connector surface completely for reinstallation.

FIGURE 7

FIGURE 8

Front Hitch

Valve

Angling

Valve

Center Lift

Valve (auxiliary)

Fourth Valve

for 3 PT Hitch

Center

Lift Lines

Hydo

Return Tube

Front Hitch Angling

FRONT

REAR

Outlet Ports

Outlet Ports

Advertising