Installation instructions – Bard CH4S1 User Manual

Page 9

Advertising
background image

Manual 2100-455M

Page

9 of 28

Insulation

MIS-2306

Top

Insert top outlet flange

from inside unit and compress

insulation

Insert top outlet flange

from inside unit and compress

insulation

Fasten flanges to

top using (8) screws

InstallatIOn InstructIOns

OPtIOnal tOP Outlet FlanGe

Top outlet flange is screwed to the back of the unit
upon delivery. Flange must be installed on to the top of
the unit before mounting. See Figure 3 for details.

mOuntInG the unIt

1. These units are secured by wall mounting brackets

which secure the unit to the outside wall surface at
both sides.

2. The unit itself is suitable for 0 inch clearance. If

a combustible wall use a minimum of 30" x 10"
supply opening dimensions for sizing. However, it
is generally recommended that a 1-inch clearance
be used for ease of installation. The supply air
opening would then be 32" x 12". See Figures 4
and 5 for details.

3. Hook top rain flashing under back bend of top. Top

rain flashing is shipped with unit attached to back of
unit on the right side.

4. Position unit in opening and secure with 5/16 lag

bolts; use 3/4 inch diameter flat washers on the lag
bolts.

5. Secure rain flashing to wall and caulk across entire

length of top. See Figure 4.

6. For additional mounting rigidity, the return air

and supply air frames or collars can be drilled
and screwed or welded to the structural wall itself
(depending upon wall construction). Be sure to
observe required clearance if combustible wall.

7. On side-by-side installations, maintain a minimum

of 20 inches clearance on right side to allow access
to control panel and heat strips, and to allow proper

airflow to the outdoor coil. Additional clearance
may be required to meet local or national codes.

FIGure 3

OPtIOnal tOP Outlet FlanGe InstallatIOns