Installation, Fitting the upper support frame, Note – Neff I89DK62N0B User Manual

Page 13: Fitting the lower support frame, Notes

Advertising
background image

13

Installation

Fitting the upper support frame

1.

Before fitting, determine the total height of the support frame

and mark the screw holes.

Note: The height of the support frame can be adjusted in 20

mm intervals.

2.

On the ceiling, mark the centre point of the appliance.

3.

Using the enclosed template, mark the positions for the

screws on the ceiling.

4.

Drill four 8 mm diameter holes to a depth of 80 mm for the

fasteners and press in the wall plugs flush with the ceiling.

5.

Fasten the upper part of the support frame to the ceiling with

4 screws.

Note: Ensure that the support frame is in the correct position.

The middle bracket defines the preferred side and must be

facing the hob control elements.

Fitting the lower support frame

Fasten the upper and lower part of the support frame at the

specified total height using 10 screws.

Notes

Ensure that the lower support frame is in the correct position.

The open side must be facing the hob control elements.

The support frame can be subsequently re-positioned by

loosening the securing screws.

[

[

[

[

([KDXVW

PP

&LUFXODWHGDLU

PP

Advertising
This manual is related to the following products: