Start-up checklist – Bryant Durapac Plus Series 551a User Manual

Page 36

Advertising
background image

Copyright 2001 Bryant Heating & Cooling Systems

CL-1

CATALOG NO. 5355-105

CUT A

L

O

N

G

DO

T

T

E

D

LINE

C

U

T

A

L

ONG DO

T

T

E

D

L

INE

START-UP CHECKLIST

I. PRE-START-UP:

 VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
 VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT (155 UNITS) OR ADJUSTMENT

BOLT AND PLATE (180, 240 UNITS)

 VERIFY INSTALLATION OF OUTDOOR AIR HOOD
 VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
 VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
 CHECK THAT FILTERS AND SCREENS ARE CLEAN AND IN PLACE
 VERIFY THAT UNIT IS LEVEL
 CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW

IS TIGHT

 VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
 VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
 VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED FOR 24 HOURS

II. START-UP:

ELECTRICAL

SUPPLY FAN AMPS

EXHAUST FAN AMPS

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

F DB (Dry-Bulb)

RETURN-AIR TEMPERATURE

F DB

F WB (Wet-Bulb)

COOLING SUPPLY AIR

F

ELECTRIC HEAT SUPPLY AIR (IF SO EQUIPPED)

F

PRESSURES

 VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 29.

GENERAL

 ECONOMI$ER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
 VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES

MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR NO. 1 L1

L2

L3

— COMPRESSOR NO. 2

L1

L2

L3

ELECTRIC HEAT AMPS (IF SO EQUIPPED)

L1

L2

L31

REFRIGERANT SUCTION

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

REFRIGERANT DISCHARGE CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

Advertising