Bryant 345MAV User Manual
Page 39

CHECKLIST—INSTALLATION
LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
VENT PIPING
Termination Location
________
Roof or Sidewall
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from
Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Condensate Drain
________
Unit Level or Pitched Forward
________
Internal Tubing Connections Free
of Kinks and Traps
________
External Drain Connection Leak
Tight and Sloped
________
Condensate Trap Primed before
Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
________
Gas Input Rate (Set Within 2
percent of
Rating Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Se-
lected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch
—39—