Dealer preparation check list – Bush Hog BH750 User Manual
Page 5

DEALER PREPARATION CHECK LIST
BH650 - BH750 - BH850 - BH950 BACKHOES
BEFORE DELIVERING MACHINE - The following check list should be completed.
Use the Operator’s Manual as a guide.
q
Machine properly assembled.
q
All safety decals readable (See decal page).
q
All bolts tightened to torque specifications given in the torque chart.
q
Machine operates properly.
q
Operator’s manual has been delivered to owner and he has been instructed
on the safe and proper use of the backhoe.
Dealer’s Signature
CAUTION:
It is recommended that the tractor be equipped with Rollover
Protection System (ROPS) and seat belt be used for all
implement operations.
.
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL
3