Handlebar assembly, Gear shift rod – MTD 410 Series User Manual

Page 7

Advertising
background image

Handlebar Assembly

Remove the handle adjustment crank, flange nut, retainer

bracket, shoulder bolt, and lock nut from the pivot bracket.
Place the handle assembly into position in the handle pivot

bracket by lining up the upper holes in the handle with the

slots in the pivot bracket. See Fig. 3-2.

Lift up the handle assembly and align the bottom holes in

the handle assembly with the holes in the pivot bracket.

Insert the shoulder bolt from the left side of the tiller

through the pivot bracket and the retainer bracket on the

right hand side of the tiller. See Fig. 3-3.

1.

2.

3.

Place the hex opening of the flange nut retainer bracket

over the flange nut securing the handle adjustment crank

and install the lock nut on the lower shoulder bolt. See Fig.

3-4.

Pivot the handle assembly into the desired position.

Tighten the bottom bolt, lock nut, and the handle

adjustment lock securely.

Gear Shift Rod

Remove the T-handle, cotter pin, flat washer and rubber

washer from the end of the gear shift rod.
Slide the rod up through the right side of bracket on the

front of the handle assembly. See Fig. 3-5.

4.

5.

1.

2.

Retainer Bracket,

Shoulder Bolt

& Lock Nut

Handle Adjustment Crank

& Flange Nut

Pivot Bracket

Figure 3-

Retainer Bracket,

Shoulder Bolts

& Lock Nut

Figure 3-3

Handle Adjustment

Crank

Flange Nut

Retainer Bracket

Figure 3-4

T-Handle

Bracket

Gear Shift Rod

Figure 3-5



s

ectiOn

2 — a

sseMbly

& s

et

-u

p

Advertising