Hydro_montage_engl 29.pdf – Liebherr HS 825 HD Litronic User Manual

Page 29

Advertising
background image

29

20-29Hydro.indd 29

13.03.2007 15:28:40 Uhr

Furthermore, the transport volume is reduced by placing the luffi ng jib sections into the main
boom sections and thanks to their low dimensions, counterweight pieces can be placed be-
low the boom sections for transportation. Specially designed brackets allow storage of the
pendants and pins on the boom sections.

Hydro_GB_Text.indd 29

21.03.2007 10:20:23 Uhr

Advertising