Liebherr LRB 125 XL User Manual

Page 5

Advertising
background image

5

A reinforcement cage is
placed in the dry casing.

Concrete is poured into
the casing.

The casing is extracted and
the concrete in the casing is
compacted by vibration.

Finished pile.

Reinforcement cage –
optionally with a geotextile
hose

Concrete is poured in

Finished pile

5

6

8

7

Advertising
This manual is related to the following products: