Broan Wall Heaters 9815WH SERIES User Manual

Wall heaters, Safety instructions, Electrical specifications

Advertising
background image

INSTALLATION INSTRUCTIONS

READ & SAVE THESE INSTRUCTIONS!

Wall Heaters

9810WH, 9815WH SERIES

FIGURE 2

SAFETY INSTRUCTIONS

Carefully read all instructions and product labels before beginning

installation.

Only mount the heater in a vertical position.

Mount the heater at least 6” above the finished floor.

Do not mount the heater over a bathtub or in a shower stall enclosure.

When mounted, the heater should not be closer than 12” to an

adjacent wall.

Do not block the wall heater — i.e., by mounting under a towel rack,

behind a door, etc.

ELECTRICAL SPECIFICATIONS

NOTE: See wiring label on heater housing. The heater may be wired

for either 120V or 240V operation and requires a separate circuit.

UNIT DIMENSIONS

Housing: 12

1

/

2

” high x 10

1

/

2

” wide x 3

3

/

8

” deep.

Grille: 14

3

/

4

” high x 11

” wide x 1” deep.

Wall Cutout: 12

5

/

8

” high x 10

5

/

8

” wide.

MOUNTING THE HOUSING

(New Construction)

Refer to Figure 1.

1. Choose heater location.

Make sure the heater will not be mounted

closer than 12” from a vertical surface or 6” from

the floor.

2. Using nails or screws, mount one side of housing to wall stud. The

flange must be flush to the stud.

3. Run wiring from circuit breaker or fuse box to heater location.

4. Install box connector into wiring entrance hole in housing’s junction

box.

5. Pull wiring through entrance hole and secure cable to box connector.

Allow 6” of wiring to make connections.

6. Finished wall opening should be 12

5

/

8

” high x 10

5

/

8

” wide.

JUNCTION BOX

ROUGH-IN FRAME

WALL

CUTOUT

WALL STUDS

10

5

/

8

12

5

/

8

FIGURE 1

EXISTING

CONSTRUCTION

NEW CONSTRUCTION

MOUNTING THE HOUSING

(Existing Construction)

1. Choose heater location. Make sure the heater will not be mounted closer than 12”

from a vertical surface or 6” from the floor.

2.

Refer to Figure 2. Make wall cutout next to a wall stud. Cutout size: 12

5

/

8

” high x

10

5

/

8

” wide.with frame.)

3. Run wiring from circuit breaker or fuse box to heater location.

4. Install box connector into wiring entrance hole in housing’s junction box.

5. Pull wiring through cutout and secure cable to box connector. Allow 6” of wiring to

make connections.

6.

Refer to Figure 3. Insert TOP of housing into cutout first so that box connector clears

the wall. Then, insert bottom of housing into cutout.

The flange must be flush with

the wall.

7.

Use nails or screws to mount one side of housing to wall stud.

FIGURE 3

WALL STUDS

JUNCTION BOX

HEATER ASSMBLY

FLANGE

MOUNTING

HOLES

ROUGH-IN

BOX

“B” UNIT MOUNTING HOLE

- TOP AND BOTTOM

Advertising
This manual is related to the following products: