Backfilling, Operation, Opera t ion – Bush Hog FC-0014 User Manual

Page 71

Advertising
background image

OPERATION

2647 01/11

Operation Section 4-31

© 2011 Alamo Group Inc.

OPERA

T

ION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and
make it more difficult to hold a level grade.

Do not use bucket in dumped position for
bulldozing. This method, shown above, will
impose severe shock loadings on dump linkage,
bucket cylinder and tractor.

Advertising