Bryant Series B 345MAV User Manual
Page 40

CHECKLIST—INSTALLATION
LOAD CALCULATION
________
Heating Load (Btuh)
________
Cooling Load (Btuh)
________
Furnace Model Selection
VENT PIPING
Termination Location
________
Roof or Sidewall
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from
Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Condensate Drain
________
Unit Level or Pitched Forward
________
Internal Tubing Connections Free
of Kinks and Traps
________
External Drain Connection Leak
Tight and Sloped
________
Condensate Trap Primed before
Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
________
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Se-
lected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch
© 1999 Bryant Heating & Cooling Systems 7310 W. Morris St. Indianapolis, IN 46231
—40—
Printed in U.S.A.
345m403
Catalog No. 5334-505