Bunn H5M User Manual

Page 16

Advertising
background image

16

15. Move the probe's flat end to the dispenser hous-

ing. The indication must be 0.

16. Move the probe's flat end away from the dispenser

housing. The indication should again be:
a.) 100 to 120 volts ac for 100 to 120 volt models,
b.) 200 to 240 volts ac for 200 to 240 volt models,
c.) 230 volts ac for 230 volt models.

17. Disconnect the dispenser from the power source.

If voltage is present as described, reinstall the probe,
the level control board and level probe are operating
properly.
If voltage is not present as described, check the pink
probe wire.

SERVICE (cont.)

Liquid Level Board (cont.)

FIG. 12 LIQUID LEVEL BOARD WIRING

BLU to Solenoid (T-1)
BLK to Overflow Safety Switch (T-2)
WHI to Terminal Block (T-3)
PNK to Level Probe (T-4)

P1784

Removal and Replacement:
1. Remove all wires from the level control board.
2. Remove two #8-32 screws holding level control

board and mounting bracket to the component
bracket.

3. Install the new level control board and mounting

bracket to the component bracket.

4. Refer to FIG. 12 when reconnecting the wires.

10267 071900

Advertising