Installation process, 1 switching off, 2 removal of the lamp cover – Barco FLM LAMP HOUSE R5976922/03 User Manual

Page 3

Advertising
background image

1. Installation process

1. INSTALLATION PROCESS

About this chapter

This chapter describes how to replace the (universal) lamp house from the FLM projector.

Adapted software for Universal Lamp House

The FLM projector software must be upgraded to version 1.7.17 or later prior to using the Universal Lamp House. The latest FLM
projector software can be downloaded from the Barco secured web site

https://my.barco.com

(browse to the product page of the

FLM projector). The FLM projector will not recognize the Universal Lamp House and will fail to start up the xenon bulb lamp when
neglecting this software upgrade. Use the Projector Toolset, which is also available on the secured Barco web site, to upgrade the
projector software. See user guide of the Projector Toolset for detailed instructions on how to upgraded the projector software.

Overview

Switching off

Removal of the lamp cover

Removal of the lamp house

Installation of the lamp house

Installation of the lamp cover

1.1

Switching off

How to switch off the projector?

1. Press first Standby.

2. Let cool down the projector until the fans decrease, at least 5 min.

3. Switch off the projector with the power switch.

1.2

Removal of the lamp cover

W

ARNING

:

This procedure may only be performed by qualified technical service personnel.

Necessary tools

7 mm flat screw driver.

How to remove the lamp cover of the projector ?

1. Release the two captive screws at the top and bottom right side of the lamp cover, using a flat screw driver.

R5976922 FLM LAMP HOUSE 18/11/2008

1

Advertising