Gas train assembly, Fig. 3, Fig. 4 – L.B. White I-34 Infraconic Spark Ignition User Manual
Page 10: Fig. 5

BUSHING
RIGID END G
OF HOSE
TO GASG
SUPPLY
VALVE, SHUT-OFF
CONNECT HOSE TO GASG
INLET, TIGHTEN SECURELY
STANDARD HOSE
GAS TRAIN ASSEMBLY
99
FIG. 3
This heater is supplied with one of the following gas train
assemblies. Refer to the appropriate illustrations.
1/8 NPT FITTING KIT, PART #23406
A
B
NUT
STEM
- ASSEMBLE FITTING
FITTING ASSEMBLY
CONTROL VALVEG
INLET
- ATTACH FITTING TO GAS INLETG
& TIGHTEN SECURELY.G
- CONNECT APPROVED GAS HOSE ASSEMBLYG
WITH APPROPRIATE CONNECTIONS TO 1/8 NPT G
FITTING.
FIG. 4
A
B
C
HOSE & QUICK COUPLING KIT
COLLAR
MALE END
COUPLING
VALVEG
SHUT-OFF
TO G
ASG
SUP
PLY
BUSHING
NIPPLE
DUST CAP
- ASSEMBLE COUPLING KIT, PART #21335,G
& TIGHTEN COMPONENTS SECURELY.G
- CONNECT TO GAS SUPPLY.
- PULL BACK COUPLING COLLAR.G
- FIRMLY PUSH MALE HOSE ENDG
INTO COUPLINGG
- RELEASE COLLAR. ENSUREG
MALE HOSE END IS SECURELYG
LOCKED INTO COUPLING.
CONNECT HOSE TO GAS INLET G
& TIGHTEN SECURELY
FIG. 5