Mueller 6x9 D.I.Y. Greenhouse User Manual

Page 22

Advertising
background image

Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions

22

hINT: screw corner of ridge

roll and middle first to

maintain pitch. Install

remainder of screws.

sKYLIGhT rIDGe roLL INsTaLLaTIoN

cauTIoN: use scaffold boards (not included) for support

while installing roof sheets and trim

Install lap screws on ridge

roll every 12 inches

Ridge Roll

Foam Block

(under Ridge Roll)

Foam Block closes the gap

in between the closures.

Roof Panel

Outside

Closure

Lap TEK

Screw

Advertising