Operating controls, Cb a d – Bunn AFPO-3 SL User Manual

Page 6

Advertising
background image

6

FLA

VOR

INPUT

1

2

WA

TER

INP

UT

REFILL

MA

IN

PO

WE

R

2

1

1

2

3

3

3

FLA

VO

R

OU

TPU

T

FLA

VO

R

OU

TPU

T

WA

TER

OU

TPU

T

FLA

VO

R

OU

TPU

T

WA

TER

OU

TPU

T

WA

TER

OU

TPU

T

OPERATING CONTROLS

A. MAIN POWER ON/OFF

The main power ON/OFF switch is located on the right of the front panel just above the power cord.

B. REFILL CIRCUIT ON/OFF

The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch.

These allow each circuit to operate independently.

P1949

C. TEST/OPERATE

The TEST/OPERATE switch is located inside the auto-fill

box just below the top access cover. For setting flow

rates and mix ratios for flavors, place the TEST/OPER-

ATE switch in the “TEST” position. This allows the op-

erator to run the water and flavor lines for each circuit

depending on the requirements for the flavor recipe.

D. PROBE CONTROL BOX LOW/OFF/HIGH

On models equipped with a dual level probe, there is a

LOW/OFF/HIGH switch located at the probe control box

on the hopper. The “OFF” position allows the operator

to disable the probe for that hopper only. THE “LOW”

and “HIGH” positions allow the operator to select the

level of product desired for that hopper.

P1951

C

B

A

D

41093 040408

Advertising