Installation, Specifications, Approved installations – Breckwell SP 6000 User Manual

Page 5: Preparation

Advertising
background image

INSTALLATION

1

INSTALLATION

Specifications

Width: 27 ¼”

Height: 35 ½”

Depth:

28 ⅝”

Weight:

225 Pounds

Flue Size: 3” or 4 “

Hopper Capacity:

90 Pounds (Corn)

(This will vary depending on fuel)

EPA Status: Exempt

Maximum BTU Input:

50,000 BTU with whole

corn


Approved Installations

Alcove, Conventional, Mobile Home


Preparation

Factory packaging must be removed, and some
minor assembly work is required prior to

installation and use. Access to the rear and

sides of the stove will be necessary at some

point in time so be sure to leave ample room for

access, otherwise, be prepared to move the

stove when necessary.

Install the ceramic Brick Panel onto the rear

combustion wall. T

HIS IS A REQUIRED

COMPONENT

. The Brick Panel is fragile, so

handle with care at all times. Your stove warranty only covers this item from thermal breakage. Impact damage
resulting from dropping or accidental abuse is not covered.

AUGER INSTALLATION: Install the auger into the auger tube as shown in

Figure 2. The flat face of the auger is toward the front of the stove, and the

beveled edge will go into the auger tube. Make sure the auger is all the way

to the rear and is engaged or seated properly.

STIR

ROD

&

BURN

POT

INSTALLATION: The Burn Pot must

be set into the Burn Pot Holder with the fuel spreader towards

the rear of the stove, as shown.

Insert the stir rod into the burn pot with the beveled connector

toward the left. Align the beveled segments so that the holes on

each piece align, and insert the cotter pin.

Pressing the Auger Feed button while the stove is off rotates the

stir motor shaft. This will assist you in aligning these two pieces.

Advertising