P

ARKING

B

RAKE

R

ELEASE

(F

IGURE

3)

Perform the following only when the machine will not
operate under its own power and it is necessary to
move the machine or when towing the machine or
when towing the machine up a grade or winching
onto a trailer for transport.

1. Close the needle valve by turning the knob clock-

wise.

2. Pump the Brake Cylinder Release Pump until the

Parking Brake Cylinder Rod clears the wheel
rotor.

3. The machine will now roll when pushed or pulled.
4. Be sure to open the needle valve and verify that

the cylinder rod has extended before the machine
is operated.

Figure 3: Brake Release Pump

F

OLD

D

OWN

G

UARDRAILS

This procedure is only for passing through doorways.
Guardrails must be returned to proper position before
using the machine.

Fold Down Procedure (Figure 4)

NOTE: When performing the following proce-

dures retain all fasteners.

1. Place controller on platform.
2. Starting at the front of the platform, remove nuts,

bolts and washers from the top of the front guard-
rail down onto the platform.

3. Close and latch the gate.
4. Remove nuts, bolts and washers from top of the

rear guardrail. Fold the rear guardrail down onto
the platform being careful to keep gate latched at
all times.

5. Remove nuts, bolts and washers from the top of

the side guardrails and from the slideout deck
midrail. Lift up and fold one side guardrail in so it
rests on the deck. Repeat with other side guard-
rails.

Erection Procedure

1. Raise side guardrails, making sure each is

pushed down to secure the guardrail in the verti-
cal position.

2. Install bolts, washers and nuts between the side

guardrails, tighten securely.

3. Raise rear guardrail assembly, aligning holes and

install bolts, washers and nuts. Tighten securely.

Figure 4: Fold Down Guardrails

W A R N I N G

!

!

Never operate the work platform with the Park-
ing Brake inoperative, serious injury or damage
could result.
Never tow faster than .3 m/sec (1 ft/sec).

Pump

Needle Valve

D A N G E R

!

!

Before entering Platform, guardrails must be
securely fastened in their proper position.