Eppendorf I-26R Large Stackable Incubator Shakers User Manual
Page 18
Advertising

18
I-26/26R Incubator Shakers M1324-0050
Operating Manual
Figure 5: Mounting Corner Braces
With the corner braces securely in place, the shaker mounted on its base will look like
this:
Figure 6: Shaker Installed on Base
6. Make sure the shaker is level; add metal shims under the base as needed to level the
unit.
7. Fully load the shaker and do a test run at normal speed. Make additional leveling
adjustments if necessary.
Advertising
This manual is related to the following products: