5 idler housing repair, Dler, Ousing – Eppendorf 5000 Digital Tier Shake User Manual
Page 28: Epair

28
New Brunswick
Operating Manual
6. Remove the drive belt.
7. Remove the main drive pulley.
8. Remove the bolts that hold the main housing to the base.
9. Replace in reverse order.
5.5
Idler Housing Repair
If it becomes necessary to repair the idler assembly, the Service Engineer will follow
the procedure below, with reference to Figures 7, 8 & 9. Each idler eccentric shaft
may be individually removed without removing the upper shaking frame or platform
assembly. For safety reasons, however, only one idler eccentric shaft at a time should
be removed.
Figure 8: Idler Assembly
To remove an idler eccentric shaft:
1. Set the power switch to
OFF
position and disconnect the power cord.
2. Remove all trays from the lower section of the upper frame assembly.
POST HOUSING
O RING