5 function speeds (machines built after s/n 38697), 6 torque requirements, Torque requirements -3 – JLG 120HX Service Manual User Manual

Page 13

Advertising
background image

SECTION 1 - SPECIFICATIONS

3120819

– JLG Lift –

1-3

1.5

FUNCTION SPEEDS (MACHINES BUILT
AFTER S/N 38697)

Telescope

Extend - 80-100 seconds.

Retract - 85-100 seconds.

Lift

Up - 85-100 seconds.

Down - 75-100 seconds.

Extend-A-Reach

Up - 15-25 seconds.

Down - 15-25 seconds.

Swing Speed 360°

143-243 seconds.

Platform Rotation

Left - 7-20 seconds.

Right - 7-20 seconds.

Ground to 120’

165 to 200 seconds.

From 120’ to Ground

150 to 200 Seconds

Ground to 120’ to Ground

315 to 400 Seconds

1.6

TORQUE REQUIREMENTS

NOTE: See Section 2 for tightening sequence of turntable

bearing bolts.

NOTE: When maintenance becomes necessary or a fas-

tener has loosened, refer to the Torque Chart Figure
1-1 to determine proper torque value.

Table 1-1. Torque Requirements

Description

Torque Value

(Dry)

Interval Hours

Bearing To Chassis

298 NM

(220 FT LB)

200/500*

Bearing To Turntable

298 NM

(220 FT LB)

200/500*

Wheel Lugs

407 NM

(300 FT LB)

50

Drive Torque Hub to
Spindle

353 NM

(260 FT LB )

500

Boom Chains

80 NM

(59 FT LB)

200

Swing Motor to Swing
Brake

102 NM

(75 FT LB)

500

Swing Brake to
Torque Hub

149 NM

(110 FT LB )

500

Torque Hub to Mount-
ing Plate

353 NM

(260 FT LB )

500

Frame Valve Bolts

9 NM

(80 IN LB)

See Note

Below**

* Retorque swing bearing bolts after first 200 hours of oper-
ation and every 500 hours thereafter.

**Re-torque frame valve bolts after checking or adjusting
steer pressure.

Advertising