SECTION 4 - MACHINE OPERATION

3121138

– JLG Lift –

4-13

4.12 SHUT DOWN AND PARK

To shut down and park the machine, the procedures are as
follows:

1. Drive machine to a reasonably well protected area.

2. Ensure boom is lowered over rear drive axle.

3. Push in the Emergency Stop at Platform Controls.

4. Push in the Emergency Stop at Ground Controls. Posi-

tion Platform/Ground Select switch to center OFF.

5. If necessary, cover Platform Controls to protect instruc-

tion placards, warning decals and operating controls
from hostile environment.

4.13 LIFTING AND TIE DOWN

Lifting

1. Call JLG Industries or weigh the individual unit to find

out the Gross Vehicle Weight.

2. Place the boom in the stowed position with the turntable

locked.

3. Remove all loose items from the machine.

4. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.