Tie down, Tie down -14 – JLG 860SJ Operator Manual User Manual

Page 72

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121138

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.

1. Remove all loose items from the machine.

2. When transporting an 800S/860SJ a step-deck or sin-

gle-drop trailer is required. To avoid damage to the plat-
form and to obtain proper weight distribution, load the
machine onto the trailer as follows;

a. Position the boom over the front wheels.

DO NOT SWING THE BOOM WHIT THE MACHINE POSITIONED ON A
TRAILER. TIPOVER MAY RESULT

b. Place the boom in the stowed position with the turn-

table locked.

DRIVE AND STEER CONTROLLERS WILL BE REVERSED WHEN THE
BOOM IS POSITIONED OVER THE FRONT WHEELS.

c. Drive it onto the trailer with the boom and platform

positioned towards the truck. Refer to Figure 4-5.,
Typical 800S/860SJ Transport.

3. Secure the chassis and the platform using straps or

chains of adequate strength.

Advertising
This manual is related to the following products: