Main gearbox assembly, Main gearbox assembly -19, Main gearbox disassembly -19 – JLG 3246ES Service Manual User Manual

Page 55

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3121166

– JLG Lift –

3-19

Main Gearbox Assembly

1.

Inspect seal surface of spindle. Remove any debris
that may be present.

2.

Apply a coating of grease to the lip seal of the hub
sub-assembly.

3.

Place Spindle Sub-Assembly on table with carrier
side up.

4.

Carefully install the hub sub-assembly (seal side
down) onto the spindle. This installation should be
a slip fit and takes place in 3 stages.

a. Stage 1: The hub slides together until the gear

teeth of the hub hit the gear teeth of the 3 out-
put planets.

b. Stage 2: Find the planet gear that is tight and

turn it until you feel it go into mesh with the
hub gear teeth, apply slight downward pres-
sure to the hub and then find the next gear
that is tight and do the same.

c. Stage 3: Once all the planet gears are in mesh

apply pressure to the hub, it should go on the
rest of the way.

5.

Install retaining ring into the groove on the OD of
the spindle carrier. This is a spiral retaining ring so
it will not require pliers. You will need to pull the
retaining ring apart and work it into the groove.

1.

Spindle Sub-Assembly

2.

Spiral Snap Ring

3.

Input ring Gear

4.

Input Sun Gear

5.

Cover O-Ring

6.

Cover Thrust Washer

7.

Cover

8.

Cover Snap Ring

9.

Pipe Plug

10.

Input Carrier Sub-Assembly

11.

Hub Sub-Assembly

Figure 3-17. Main Gearbox Disassembly

Advertising
This manual is related to the following products: