c. Refer to the Torque Sequence diagram as

shown in Figure 3-45., Swing Bearing Torque
Sequence.
Clean any residue off the new bear-
ing bolts, then apply a light coating of Loctite
#271 and install the bolts and washers through
the frame and outer race of the bearing. Tighten
the bolts to a torque of190 ft. lbs. (258 Nm) w/
Loctite.

d. Remove the lifting equipment from the bearing.
e. Using suitable lifting equipment, carefully posi-

tion the turntable assembly above the machine
frame.

f. Carefully lower the turntable onto the swing

bearing, ensuring that the scribed line of the
inner race of the bearing aligns with scribed line
on the turntable. If a new swing bearing is used,
ensure that the filler plug fitting is at 90 degrees
from the fore and aft center line of the turntable.

g. Clean any residue off the new bearing bolts,

then apply a light coating of Loctite #271 and
install the bolts and washers through the turnta-
ble and inner race of the bearing.

h. Following the Torque Sequence diagram shown

in Figure 2-49. Swing Bearing Torquing
Sequence, tighten the bolts to a torque of 190 ft.
lbs. (258 Nm) w/Loctite.

i. Remove the lifting equipment.
j. Install the rotary coupling retaining yoke brack-

ets, apply a light coating of Loctite #242 to the

attaching bolts and secure the yoke to the turn-
table with the mounting hardware.

k. Connect the hydraulic lines to the rotary cou-

pling as tagged prior to removal.

l. At ground control station, use boom lift control

to lower boom to stowed position.

m. Using all applicable safety precautions, activate

the hydraulic system and check the swing sys-
tem for proper and safe operation.

Swing Bearing Torque Values

1. Outer Race - 190 ft. lbs. (258 Nm) w/Loctite.

2. Inner Race - 190 ft. lbs. (258 Nm) w/Loctite.

3. See Swing Bearing Torquing Sequence.

CHECK THE INNER AND OUTER SWING BEARING BOLTS FOR
MISSING OR LOOSENESS AFTER FIRST 50 HOURS OF OPERA-
TION, AND EVERY 600 HOURS THEREAFTER.