3 pre-operation, General, Pre-operation -5 – JLG 41AM Operator Manual User Manual

Page 15: General -5

Advertising
background image

SECTION 1 - SAFETY PRECAUTIONS

3121211

– JLG Lift –

1-5

1.3

PRE-OPERATION

General

Read and understand this manual before operating the

machine.

Only authorized and qualified personnel can operate the

machine.

Do not operate this machine until complete training is per-

formed by authorized personnel.

Before operation check work area for machine traffic such

as forklifts, cranes, and other construction equipment.

Set-up machine for operation only on a smooth, firm sur-

face on which the machine is capable of being leveled.

Be sure that operators of other overhead and floor level

machines are aware of the aerial work platform’s presence.
Disconnect power to overhead cranes.

The operator is to take safety measures to avoid all hazards

in the work area prior to machine operation.

Do not operate this machine until it has been serviced and

maintained according to requirements specified in the Ser-
vice and Maintenance manual.

Before machine operation perform inspections and func-

tional checks. Refer to in Section 2 of this manual for
detailed instructions.

Advertising
This manual is related to the following products: