SECTION 5 - OPTIONAL EQUIPMENT

5-4

– JLG Lift –

3121211

4. Drill one (1) .50 diameter (1/2") hole, one (1) per side

into the center frame crossmember for the wiring
grommet see Figure 5-2.

5. Install the spring clips to the base frame at location of

drilled holes, using two (2) #10-24 x .625 bolts and
two (2) nuts and two (2) lock washers per spring clip.

6. Install the grommets supplied into the .50 dia. holes.

7. Locate the two short adapter wiring harnesses and

route one through each grommeted hole on the cen-
ter frame crossmember.

8. Wire the adapter wiring harness ends together and to

the interlock relay wires as shown in Figure 5-3.

9. Press the two (2) - three (3) prong connector ends into

the spring clips mounted on the base frame.

10. Reconnect power to the machine and lower the plat-

form to the stowed position. Stow the outriggers.

11. To verify installation, set-up and assemble straddle

extension as described in the Section 5-3. If outrigger
interlock LED’s on the straddle extension light up
when completely assembled, and power is supplied to
the platform, then installation is complete.