Dimensional data, Torque requirements, Dimensional data -7 torque requirements -7 – JLG 660SJ Operator Manual User Manual

Page 111: Dimensional data -7, Torque requirements -7, Dimensional data torque requirements

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121205

– JLG Lift –

6-7

Dimensional Data

Torque Requirements

Table 6-9. Dimensional Data

Machine Height (Stowed)

8 ft. 4.75 in. (2.56 m)

Machine Length (Stowed)
600S Over Drive Axle
600SJ Over Drive Axle
660SJ Over Drive Axle

27 ft. 11.125 in. (8.51 m)
32 ft. 11.75 in. (10.05 m)
35 ft. 2.875 in. (11.40 m)

Machine Width
2WS/2WD
2WS/4WD
4WS/2WD
4WS/4WD

7 ft. 11.375 in. (2.42 m)
7 ft. 11.4375 in. (242 m)
7 ft. 11.4375 in. (2.42 m)
7 ft. 11.375 in. (2.42 m)

Wheelbase

8 ft. 1.50 in. (2.48 m)

Boom Elevation - 600S

+60 ft. 2 13/16 in. (18.36 m)
-6 ft. 1 11/16 in. (1.87 m)

Boom Elevation - 600SJ

+60 ft. 5 3/4 in. (18.43 m)
-9 ft. 9 3/16 in. (2.98 m)

Boom Elevation - 660SJ

+66 ft. 7 5/8 in. (20.31 m)
-11 ft. 5 1/4 in. (3.49 m)

Table 6-10. Torque Requirements

Description

Torque Value (Dry)

Interval

Hours

Bearing To Chassis

See Note

50/600*

Bearing To Turntable

See Note

50/600*

Wire Rope

15 ft. lbs (20 Nm)

150

Wheel Lugs

See Section 6.4

150

Engine Mounting Bolts

165 ft. lbs. (231 Nm)

A/R

Engine Manifold Mounting
Bolts

30 ft. lbs. (42 Nm)

A/R

*Check swing bearing bolts for security after first 50 hours of operation and
every 600 hours thereafter. (See Swing Bearing in Section 3.)

Advertising
This manual is related to the following products: