12 shut down and park, 13 lifting and tie down, Lifting – JLG 680S Operator Manual User Manual

Page 76: Lifting -14, 13 lifting and tie down lifting

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121678

4.12

SHUT DOWN AND PARK

To shut down and park the machine, the procedures are as fol-
lows:

1.

Drive machine to a reasonably well protected area.

2.

Ensure boom is lowered over rear drive axle.

3.

Push in the Emergency Stop at Platform Controls.

4.

Push in the Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center OFF.

5.

If necessary, cover Platform Controls to protect instruction
placards, warning decals and operating controls from hostile
environment.

4.13

LIFTING AND TIE DOWN

Lifting

1. Refer to the Serial Number Plate, refer to the Specifica-

tions section of this manual, or weigh the individual unit
to find out the Gross Vehicle Weight.

2.

Place the boom in the stowed position.

3.

Remove all loose items from the machine.

4. Attach lifting device and equipment only to the desig-

nated lifting points.

5.

Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.

Advertising